Assistance for the preparation is only impact assessment to be accompany an EU step on reducing the values of high-speed broadband infrastructure deployment: Finishing Booklet

November 15th, 2012 by admin Leave a reply »

A survey prepared for that European Getting DG Communications Organizations, Posts & Technological. This study ended up being carried out for that European Commission by – Analysys Mason Few. Authors: Shiny Yardley, Rod Parker, Pete Vroobel. this summer. yeah… This in turn document is the Finishing Report of a exude completed by Analysys Francmason Limited regarding the Hot spots Commission (DG Information The society and Media) to evaluate the potential final result of the following through 5 regulatory measures on steering clear of the cost of implementing high-speed broadband infrastructure in front of Eu:

a common a centralised atlas ture of passive infrastructure

a common mandated access to unaggressive infrastructure

a common a one-stop shop on top of rights of way plus administrative types of treatments

a common a database where just about planned civil works qualified to developed

a common an obligation to render all new buildings containing high-speed Internet (100Mbit/s) besides mandated apart access to this particular terminating sparte… yeah

Further information on Support for that preparation is only impact assessment to be accompany an EU step on reducing the values of high-speed broadband infrastructure deployment: Finishing Booklet

Work revised: 18 November this summer

Advertisement

Leave a Reply

You must be logged in to post a comment.